When a user is assigned tasks from a workflow in Datarails, they gain access to the Tasks Interface. This feature is essential for delegating tasks and collecting specific inputs from colleagues.
A user will only see the Tasks Interface if they have been assigned tasks within a workflow. For example, department heads might be assigned tasks to complete their respective sections of a Budget Template.
Assignee's View
-
Accessing the Interface: After logging in, users are automatically directed to the Tasks Interface.
-
Interface Overview:
- Task List: Displays all tasks assigned to the user.
- Reporter Information: Shows who reported each task (e.g., the support user).
- Tags: Indicates tags related to the data the user needs to manage.
- Task Status: Displays the current status of each task.
-
Interacting with Tasks:
- Task Details: Each task includes a description and a due date (e.g., submit a new version of the General Ledger by July 31st).
- Interaction Options:
- Download: Obtain an existing version of the data (e.g., General Ledger).
- Upload: Submit a new version if changes are made outside Datarails.
- Edit: Modify an existing version directly within the Datarails interface.
- Mark as Complete: Update the task status to complete, which will be reflected in the main workflow interface.
-
Special Tasks – Chart of Accounts:
- Update Unmapped Items: Contributors can address unmapped items in the Chart of Accounts.
- Download: Option to download the entire Chart of Accounts.
-
Accessing Related Files:
- Navigate to Settings Menu: View file boxes relevant to the tasks.
- Example: In the test scenario, the General Ledger file box will be accessible due to the associated task.
© Datarails Ltd. All rights reserved.
Updated
Comments
0 comments
Please sign in to leave a comment.